Outdoor Structures
Do It Yourself:

Fences Decks Screen Porches
Material Sales Material Sales Material Sales
We measure and provide Materials We measure and provide Materials We measure and provide Materials
 
Pre-Construction Pre –Construction Pre-Construction
Guidance and Post Location. Mark Locations for all posts and gate posts- $25/per hour Permit Preparation and Submittal-$50/per hour Permit Preparation and Submittal-$50/per hour
 
Construction Construction Construction
Demolition and Debris Removal-Starting at $2 per foot. Minimum $50. Demolition and Debris Removal-Starting at $2 per sq foot. Minimum $50 Demolition and Debris Removal-Starting at $2 per sq foot. Minimum $50
Dig Post Holes- $15 per hole. Minimum charge Dig Footers and obtain inspection approval-$200 up to 10 footers Dig Footers and obtain inspection approval-$200 up to 10 footers
Dig Post Holes and set posts in concrete-$25 per hole. Minimum charge.    
 
Consulting Consulting Consulting
Provide consulting during construction
On site-$25 per hour
Telephone or email consulting $15 contact.
Provide consulting during construction
On site-$30 per hour
Telephone or email consulting $15 contact.
Provide consulting during construction
On site-$30 per hour
Telephone or email consulting $15 contact.
  Manage Subcontractors - $250. Manage Subcontractors - $250.
 
Clean-Up and Remove Materials Clean-Up and Remove Materials Clean-Up and Remove Materials
$25/hour $25/hour $25/hour